Job Type: Bathroom Remodel
Job No: 217
Date Completed: February 2007
Total Cost: $7500
Time to complete: 1 month |

Before |

After |
|
This homeowner wanted to update their
bathroom to a more modern look. They picked a very modern vessel style
sink with in-wall mounted faucet. The vanity base was a standard Ikea
cabinet that was modified from 24" down to 20". We also installed a deck
mount tub with a tile skirt instead of a standard tub with built in
skirt. 12"x12" porcelain tiles were installed on the floor and wrap
right up and into the tub area. We also custom made a 4"x6" free
floating style maple shelf to fit just above the sink and toilet. |
|
|
Job Type: Bathroom Remodel
Job No:
200
Date Completed: June 2006
Total Cost: $3500
Time to complete: 7 days |

Before |

After |
| This
homeowner wanted to replace a worn out bathroom with something more
contemporary. They choose to keep their tub and toilet, but everything
else was replaced. We installed new 12"x12" porcelain tile on the floor
and matching 6"x6" porcelain tile on the walls of the tub. The other
walls in the bathroom had new wainscoting with cap rail installed. A new
pedestal sink was installed to free up more floor space, along with all
new chrome hardware and medicine cabinet. |
| |
Job Type: Crawlspace Waterproofing
Job No: 400
Date Completed: June 2009
Total Cost: $5000
Time to complete: 1 month |

Before |

After |
| This
homeowner had a very wet crawlspace with standing water and very moist
air. We dug a trench around the perimeter of the house leading back to
the sump pit. We installed a 4" corrugated pipe with sock in the bottom
of the trench and then filled the trench with pea gravel. This allows
water to easily make it to the sump pit and be pumped out. The last step
was installing new plastic to keep the ground moisture from entering the
air. |
| |
Job Type: Sheet Vinyl Flooring
Job No: 201
Date Completed: August 2006
Total Cost: $750
Time to complete: 2 days |

Before |

After |
| This house
had carpet installed in the master bath when the house was built. After
only 5 years the carpet was dirty, stained, and smelled like mildew. We
removed the carpet and replaced it with a single piece of sheet vinyl.
We installed new white quarter round and brass transitions to match the
rest of the house. |
| |
Job Type: Sheet Vinyl Flooring
Job No: 204
Date Completed: August 2006
Total Cost: $350
Time to complete: 1 day |

Before |

After |
| This
homeowner was selling their house and wanted to update the worn and
discolored vinyl by the front door. We installed a new layer directly
over the old and gave this entry way a new clean look. |
| |
Job Type: Laminate Flooring
Job No: 201
Date Completed: August 2006
Total Cost: $1250
Time to complete: 4 days |

Before |

After |
| This
homeowner wanted to replace their discolored and worn out vinyl with new
laminate flooring in their kitchen. We put in the laminate as well as
matching transitions and new quarter round. |
| |
Job Type: Laminate Flooring
Job No: 214
Date Completed: January 2007
Total Cost: $1500
Time to complete: 7
days |

Before |

After |
| Just like the
above homeowner this one also wanted to replace their old worn out vinyl
with new laminate. They picked a dark color floor because they have all
white cabinets and appliances. The dark flooring really helps make the
cabinets and appliances look better. |
| |
|
|